We had a great day for the 1st official trail day at RV in a while. We were able to complete the repair of a badly eroded switchback on the Cushetunk trail in 1 session. 1st we built a berm on the upper part of the trail to keep the water off the lower part. Then on the trail itself we filled the 2' deep rut with large rocks & dirt. We then built a riding berm on the high side to add a little fun factor. Lastly we narrowed down the trail for that single track feel. A very rewarding day.
I'd like to thank the following volunteers for their VERY HARD WORK, dealing with the bugs & finishing all the Muchkins.
Norman Albrecht
Joseph Zurawski (AKA Norm Z.)
Marc Lewis
Nadine Dalesandro
Mike Wolert
Paul Miranda
Allen Russel
Joe Patanella
Bob Adase
Kirt Mills
Ps. Almost forgot. We also trimmed back the corridor from top to bottom of the switchback trail.
I'd like to thank the following volunteers for their VERY HARD WORK, dealing with the bugs & finishing all the Muchkins.
Norman Albrecht
Joseph Zurawski (AKA Norm Z.)
Marc Lewis
Nadine Dalesandro
Mike Wolert
Paul Miranda
Allen Russel
Joe Patanella
Bob Adase
Kirt Mills
Ps. Almost forgot. We also trimmed back the corridor from top to bottom of the switchback trail.