Stone is Finally Set in Viet Nam

pixychick

JORBA: Ringwood
JORBA.ORG
The stone that was uplifted from the rootball of a downed tree last year in the Hurricane is finally re-set and open for riding. A big thanks to James for the hoist , vision and know-how. Thanks to Tom as well for the extra hands. Enjoy!
 

Attachments

  • stone before.jpg
    stone before.jpg
    73.2 KB · Views: 518
  • stone hoist.jpg
    stone hoist.jpg
    96.2 KB · Views: 535
  • stone done.jpg
    stone done.jpg
    99.9 KB · Views: 525
Wow!... That's some heavy duty rockin rollin!
Thanks for the hard work.. that looks like it was quite the project.
 
That's awesome!!

Can we borrow that hoist thing for Sourlands? There's a rock or 100 that need to be relocated there as well.

-Jim.
 
amazing work! That is an awesome use of pallet racking if I ever saw one 🙂
 
wow, really amazing.

although it was funny watching kirt slide off of that thing over the winter. needless to say the ride back that day was minimal stopping, we made it back in record time.
 
Badass!

I'll bet there were some tense moments between pics 2 & 3.

Thanks for the great work!
 
Well done, we rode past as you guys were working, its like using 3 poles and hoist but the modern version, will ride this next time
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Back
Top Bottom