Dec 21st TM Report: COLD!!! Mick, Chuck, Joe & Tom. We divided forces to address two areas.
The widening mud hole on Blue Trail near the rowing center.
Re alignment of Blue trail to bring it upgrade. Section between South Post & Conover road.
A nick was cut to drain the mud hole. The logs and debris were removed and the hole was filled with sandy gravel and clay.
It will be soft until the water is pushed out so be aware when riding this section. Please step fill a rut if you leave one!
View attachment 113949
The realignment work on blue was preliminary clearing and debris removal. The brush hog was used to clear paths for the future re-alignments.
The overall goal is to pull the trail line uphill and away from the existing wet, unsustainable trail surface.
The trail surfaces will be completed in sections this spring.
View attachment 113950
Big thank you to Joe & Chuck.
Happy Holidays!
TAS