TM report for Sat, Oct 16th. Beautiful morning! We focused on Blue Trail, repairing the trail surface between the Rowing Center and the single bridge. A few decisions and the crew quickly set to work. Cut drainage nicks and trenches. Excavated gravel and clay soil for the trail bed from out of the upturned tree holes. (good stuff!). The trail surface was raised and packed. Time will tell as to how well the surface holds up but we will keep an eye on it.
Three yellow jacket stings were suffered but we perserverred!
Big thanks to the crew: Geff, Rudy, Julien, Matt, Caleb, Al, Mick & yours truly.
TAS