Should use it as a foundation for something more substantial and sustainable. It is one of most used parks in NJ.Stupid, non-engineer, layperson question; would it make sense to put some sort of interspersed arresting feature further upstream? Like some significantly spaced out boulders/rocks like you have on the shore line there? That way the trees hit that and get hung up here and there as opposed to clogging the drain so to speak.
Concrete abutments, with either steel or big ole wood beam supports. 10-15’ span. New structure can be 3’ above current bridge for debris to flow under. Will allow a much better tie in on the 27 lot side also. Good place for JORBA to flex some funds.