Around 1,400.Looks great, how many sqft are you adding?
Just saw this...Looking good! Hopefully it all starts to come together at a quicker pace now!
Did the extra insulation in the RV help out with the cold week we just had?
starting to look like a new house now! I can picture a lot of time spent on that nice wrap around porch sipping some cold ones when its all done.Got a roof today...
View attachment 232150
Unfortunately, I live in a 50mph county road so it's not the most enjoyable.starting to look like a new house now! I can picture a lot of time spent on that nice wrap around porch sipping some cold ones when its all done.
looks awesome. So how are you feeling about all of it all at this point? Has to be stressful but having the roof on has to feel good. It always pains me to see wet wood so I'd have been on edge every time a rain drop or snow flake fell....but its an unavoidable part of the process. BTW you basically are building my wifes (and my) perfect house. Ranch type house with a basement area and a wrap around porch.Got a roof today...
View attachment 232150
Yeah the sub floor it heaved at all joints, hopefully it drys out some. At this point if they stopped showing up I could figure out the rest of the subs/project.looks awesome. So how are you feeling about all of it all at this point? Has to be stressful but having the roof on has to feel good. It always pains me to see wet wood so I'd have been on edge every time a rain drop or snow flake fell....but its an unavoidable part of the process. BTW you basically are building my wifes (and my) perfect house. Ranch type house with a basement area and a wrap around porch.
There are a few things they need to do to pass inspection. But in this case, it's supposed to end up a 2' 4" pocket door. That's the master bathroom so the doorway won't remain that big. I'm assuming they'll cut the header and finish framing it@Cole its coming along! What happened to the king stud on the right side for the header in the 3rd pic?
@Cole its coming along! What happened to the king stud on the right side for the header in the 3rd pic?
There are a few things they need to do to pass inspection. But in this case, it's supposed to end up a 2' 4" pocket door. That's the master bathroom so the doorway won't remain that big. I'm assuming they'll cut the header and finish framing it
No, haven't thought of it.Coming together nicely.
Have you considered a 3rd party pre drywall inspection as insurance?
Might be cheap insurance, same with a Warranty inspection before your 12 months are up.No, haven't thought of it.
Remember this post, so you can say "I told you so" if I choose to ignore you adviceMight be cheap insurance, same with a Warranty inspection before your 12 months are up.