9/19/22 Trail Maintenance Thank Youze.
Big thanks to John D, JohnE, Jim C (everyone in sNJ knows Jim, aka: Chuck Norris), Rick C, and Kurt for another long day of work in the forest!
Over the past two 8/16 and 9/19 maintenance days. The PBT has been brushed back from the NE corner down to the southern QBR crossing. Rick C is eager to start brushing back the northern leg of the PBT on 9/27/22. Will post details soon.
Big thanks to John D, JohnE, Jim C (everyone in sNJ knows Jim, aka: Chuck Norris), Rick C, and Kurt for another long day of work in the forest!
Over the past two 8/16 and 9/19 maintenance days. The PBT has been brushed back from the NE corner down to the southern QBR crossing. Rick C is eager to start brushing back the northern leg of the PBT on 9/27/22. Will post details soon.