Jorba will having Trail Building at Ringwood State Park Sunday April 10.
Meet at Lot C at 8:45. Be prepared to RIDE YOUR BIKE to the work site. The work site is 5 miles from the lot so be prepared for the ride in. Tools will be provided. Work usually goes until 1:00, but you are free to leave when you want. Heavy or steady rain cancels.
We will be working in the Ringwood-Ramapo Tr(RED) going out to Skyline Dr.
Meet at Lot C at 8:45. Be prepared to RIDE YOUR BIKE to the work site. The work site is 5 miles from the lot so be prepared for the ride in. Tools will be provided. Work usually goes until 1:00, but you are free to leave when you want. Heavy or steady rain cancels.
We will be working in the Ringwood-Ramapo Tr(RED) going out to Skyline Dr.