Wildcat 2022 Trail TuneUps

trailhead

JORBA: Wildcat/Splitrock
JORBA.ORG
Thursday 9/15/2022 5:00pm at the Bat cave parking area.

I plan to work on improving conditions along Beach Glen West. In preparation for winter, the stream crossing needs attention as ORVs continue to erode the stream bank which leads to more trail flooding and wet frozen feet.

A dozen or so rocks need to be moved and I have back issues, so help is appreciated. We also have a new rock sling to help out with this.

In addition, stream bank stabilization on the other side using downfall if time permits.

Wildcat Ridge
 

gmb3

JORBA: Sourlands
JORBA.ORG
In! but may be a little late. This is the Blue trail right off one end of the parking area, right? And you're talking about that first stream you come to? I'll find you.
 

gmb3

JORBA: Sourlands
JORBA.ORG
It was short since i was in hiking boots on top of SPDs. Just wanted to test out my lights and new brake levers. Did some pricker trimming on the tailings pile and the section immediately after the moto sandpit area too though. Glad i could finally help out at Wildcat, even if only minor. It has been a while for me.
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Top Bottom