The AmeriCorps/NYNJTC crew with the help of volunteers has been working hard at Sterling this spring and summer.
They have reached the power line up above where the current temporary trail goes under it on the fire road. So you now can now make a loop using the power line service road to connect to the existing temporary trail. They have 200' or so of trail roughed in beyond the power line. This piece of trail is about 1/2 done!
And this week construction work commenced for the bridge at the mud hole/stream crossing on the Hutchinson trail. Today the crew was working on getting suitable piers (boulders) in place.
As usual any volunteer help is always appreciated.
They have reached the power line up above where the current temporary trail goes under it on the fire road. So you now can now make a loop using the power line service road to connect to the existing temporary trail. They have 200' or so of trail roughed in beyond the power line. This piece of trail is about 1/2 done!
And this week construction work commenced for the bridge at the mud hole/stream crossing on the Hutchinson trail. Today the crew was working on getting suitable piers (boulders) in place.
As usual any volunteer help is always appreciated.