Sourlands Trail Work Session Sat 4/27 9am

gmb3

JORBA: Sourlands
JORBA.ORG
Our first trail day for 2019 is this Saturday, 4/27 at 9am. Meet at the East Mountain Road lot at 9am. BYO work gloves, water and bug spray and be prepared to hike (or ride) up to the work site. Tools will be provided. Work will be to continue armoring the stream/boulder/pipeline side of Chunky Monkey (new blue trail) so that we can ride it in early spring and after heavy rains. The work we did there with the Boy Scout troop last year is holding up awesome and there's still a cache of rocks they harvested for us.
 

jklett

Well-Known Member
Do you think they know it's a TM and not a ride?
I guess if they don't, they'll find out pretty quickly!


I put it in the title and linked to the post in the description. I'm pretty sure it's an obvious work detail.
Screenshot_20190424-142153.png
 

Patrick

Overthinking the draft from the basement already
Staff member
My son now has a track meet. Out.
Will get at it one day tho
 

gmb3

JORBA: Sourlands
JORBA.ORG
Final BUMP for tomorrow! Looks like perfect trail building weather too - high 50s and the rain today/tonight should really show us where those wet spots are. Prepare to get muddy!
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Top Bottom