Sourlands - New trail build session Sat 4/29

J-Dro

Well-Known Member
JORBA & Somerset Cty are going to continue working on the new trail high up on the ridge that was started last year. Meet up at the East Mountain Road lot at 9am on Sat 4/29. Bring work gloves, other tools will be supplied.

If you like riding technical trails, you're going to love this one.

Thanks for looking.
 
In. Also the arm ripping stickers are already starting to reach out into the trails, will try to get to some this week.
 
I should be in. Will likely plan to meet you up at the trail so I can get a quick ride in beforehand. @J-Dro, you were right on the conditions at 6MR on Sat. Got hit by a bit of rain mid-way through but trails were pretty much perfect. See you Saturday.
 
Checked it out today - looks like someone's been doing some work up there - a little longer than last time. I might meet you guys at the new trail too.
 
The only problem with "meeting at the trail" is that tools need to be carried up there. They don't just magically appear. :)o_O
 
Be like this guy. Help build awesome singletrack. :cool:

18119032_10154744820154086_2492585926235560086_n.jpg
 
Wifey gave me the all-clear. I'm in! Weather sure is gonna be different than the last time i was up there!
 
If anyone is planning to ride before TM, the best place to meet up is where 3-amigos crosses the pipeline. The Ranger should be able to get the gator with tools up to that spot. Then it's not too far of a hike to the work location from there.
 
Jeff took some more pics but today was heavy lifting day - I think we moved the biggest rock ever using Jeff's gladiator(?). It was even bigger than this one:

18160482_1876261809329967_7220059716448157696_n.jpg


18095744_102792460292140_1357768397831536640_n.jpg


This will be an awesome trail when completed
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Back
Top Bottom