Can anyone dig on Monday Mornings?

jdog

Shop: Halter's Cycles
Shop Keep
I have been getting into a Monday morning routine of a couple of hrs of digging.

I can not promise that I’ll do this every week, but please post here Sunday night if you think you can swing a 9 am Monday dig session.

Usually riding in but not always.

J
4C39F4B1-DB99-4A17-A81D-DAD694539856.jpeg
7CCF7E4B-F931-46CE-B524-9D272A2AEFC2.jpeg
2F378A2A-34C2-4ED6-901E-8D5588994E0F.jpeg
 
If you still need help on Monday May 16th let me know. I can help out. In training next week so cannot make it then.
 
thanks for all of this @jdog!

i will definitely keep this in mind, unfortunately been commuting into NYC most mondays lately, but would love to help next time i'm free.
 
I think i'll be working on adding handrails to to bridges so the NICA race can happen.. :Ugh:
 
These huge guardrails make it possible for us to hold NICA races at this park.

Im by no means a fan, but I will concede that they are needed to keep the course up to the letter of the law.

SO.. Its for the kids..
 
Aren’t these going to tend to force the kids like…off the side?
 
just make sure your bars are less than 820mm
Aren’t these going to tend to force the kids like…off the side?
Nica requires guard rails on both sides. This photo just shows the first one being built. Without these in place, the NICA race Would have been moved to it different venue.

Almost no one is happy to see them, but keep in mind that 400 or so kids will have a chance to race in the state where NICA didn’t exist not that long ago.
 
The rails seem much taller than they are - 42"
The deck is currently 35", and will be expanded between 45"-48" depending on the abutment,

I was considering an angled cut at the top of the posts so it would "feel" wider.
Seemed like something i could do afterwards if needed.
A top board should also be installed - "on the flat"
Could also make the middle rails flush with the posts. Not horrible.


1652173441844.png


The bridge was wider, and not as long last year.

1652174496689.png
 

Attachments

  • 1652174418040.png
    1652174418040.png
    1.2 MB · Views: 136
The rails seem much taller than they are - 42"
The deck is currently 35", and will be expanded between 45"-48" depending on the abutment,

I was considering an angled cut at the top of the posts so it would "feel" wider.
Seemed like something i could do afterwards if needed.
A top board should also be installed - "on the flat"
Could also make the middle rails flush with the posts. Not horrible.


View attachment 184450

The bridge was wider, and not as long last year.

View attachment 184452

So the bridge is going to be built twice??
 
is it progress ?

20220509-141358.jpg


20220509-143231.jpg
Nica requires guard rails on both sides. This photo just shows the first one being built. Without these in place, the NICA race Would have been moved to it different venue.

Almost no one is happy to see them, but keep in mind that 400 or so kids will have a chance to race in the state where NICA didn’t exist not that long ago.
Sorry didn't mean to imply that I was opposed to the railing. I meant to poke fun at @Patrick and the 1 post he had up when I got there.
 