5 year rainbow bridge anniversary.

Patrick

Overthinking the draft from the basement already
Staff member
It has been 5 years since the installation of the rainbow bridge at the picnic table.
It is still looking good - even tho nica required a wider twin a bit downstream.

Thank you @jdog and @MR.X, and the team that made this happen.

466664_10201018273849264_1472671120_o.jpg
 
Last edited:

Patrick

Overthinking the draft from the basement already
Staff member
Pretty sure it's history. I almost rode it first time there this year until I realized someone chain sawed all the slats. The trail jog to the left wasn't obvious

damn, just remove the middle 6 or so, to at least make it interesting!

wonder where we could re-purpose the trusswork?
 

WJF

Well-Known Member
With much sadness, there is joy in knowing it will be going to another place to bring much happiness
25851111-CE00-42D1-B325-CA9BFD989BB3.jpeg
 

Patrick

Overthinking the draft from the basement already
Staff member
would have been easier to unscrew the boards....
 

gmb3

JORBA: Sourlands
JORBA.ORG
Pretty sure it's history. I almost rode it first time there this year until I realized someone chain sawed all the slats. The trail jog to the left wasn't obvious

I agree the trail jog to the left wasn't obvious to me the other day either having not been there in months. You know what it could use to make it more obvious (and fun) though? ...a berm!
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Top Bottom