It was added in the 2014 NEC. NJ typically runs 3 years behind code cycle. We normally see either gfi receptacle under the sink or single receptacle under the sink with a gfi breaker. If it’s hardwired with a gfi breaker, means to lock breaker in off position is required for service
I had a bilateral total knee replacement in May of '21. I used Dr. Peter Sculco from HSS. I would highly reccomend both. I was back to work in six weeks and I feel great. Wish I had done it sooner. Best advice I can give is research your surgeon and bust your ass in PT.
Had a great time today, first MTBNJ group ride and first time at Allaire. Will definitely be back for both. Thanks to @Mitch @pooriggy and Mike. And thanks to the OOS guys for welcoming me back