Allaire TM session 8/6 thanks

mike_243

JORBA Board Member/Chapter Leader
JORBA.ORG
A big thanks to our crew today we were able to split into 3 groups and weed wack the hog bog, the entrance to the river trail and the entrance to the campground side.
We also repaired a wet spot on the glass trail and did quite a bit of trim back work.
our crew today..


Mike Confenti
Matt DeFelice
JT DeFelice
Robert Denigris
Tod Christinson
Chris Cornell
Mitch Gold
Mike Lovas
Andy Robinson
 

Matt_

I Get Jokes
Great crew today!

We built up the tread on glass in very thin layers with a lot of tamping.... its a high speed curve and needed a lot of dirt, even with the outer edge being cut down. We'll probably have to touch it up after it gets ridden a bit, but it should be pretty solid.

In case anyones wondering why all the blueberries in Allaire disappeared today.... "JT WUZ HERE"

20170806_090736-1.jpg
20170806_090749.jpg
20170806_102936.jpg
20170806_103048-1.jpg
 

Johnny Utah

Well-Known Member
Great crew today!

We built up the tread on glass in very thin layers with a lot of tamping.... its a high speed curve and needed a lot of dirt, even with the outer edge being cut down. We'll probably have to touch it up after it gets ridden a bit, but it should be pretty solid.

In case anyones wondering why all the blueberries in Allaire disappeared today.... "JT WUZ HERE"

View attachment 55755 View attachment 55756 View attachment 55757 View attachment 55758

Well documented, solid work.
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Top Bottom