Proposed Morris County hiking, biking trail gets $1.9M in federal funds

http://www.nj.com/news/index.ssf/200...g_trail_i.html

Proposed Morris County hiking, biking trail gets $1.9M in federal funds
By Lawrence Ragonese/The Star-Ledger
November 15, 2009, 7:30AM
MORRIS COUNTY -- A proposed six-mile hiking and biking trail that would run through Pequannock and Wayne, connecting to NJ Transit’s Mountain View train station, has gotten long-awaited federal authorization, including $1.9 million in federal dollars, according to Morris County officials.

The money will be used to design the project, including engineering, surveying, topographical, wetlands and other environmental reviews, said Frank Pinto, director of the Morris County Department of Planning and Development.

If all goes well, construction of the trail could begin within two years, said Jerry Rohsler, the county’s transportation director. The estimated total price tag for the project is $4 million.

"It took 10 years to get authorization, so it’s a big deal to get this moving to the next stage," said Pinto.

But he stressed there are still plenty of obstacles to overcome, including creating a safe means for hikers and bikers to get over the Pompton River.

The asphalt trail, which would run from Post Lane in Riverdale, through Pequannock and to the train station in Wayne, would be the first of its kind in the Route 23 corridor region of Morris and Passaic counties. It has been especially appealing to transportation officials because it connects with mass transit.

"We’re expecting this will be used a lot," said Rohsler. "If it wasn’t such a good project, we would not have spent all of this effort continuing to pursue it."

The bike path would be open to cyclists, strollers, in-line skaters and horseback riders, but motorized vehicles, such as dirt bikes, would be prohibited. The trail would provide a link to Pequannock Valley Park and the aquatic park along the Wanaque River, officials said, and also would pass beneath Route 23, providing a safe highway crossing.

Pequannock officials have said they hope to post kiosks along the trail and throughout town, pointing bikers to downtown shopping and historic sites.

While design work moves ahead, Morris County officials will negotiate an easement agreement with NYS&W railroad for use of the path that abuts its long-unused tracks, said Rohsler. He said the two sides have spoken "extensively" and he is optimistic an agreement can be reached.

Nathan Fenno, an NYS&W vice president, has said the railroad supports the trails concept but noted there are details to work out, including safety and liability issues, plus compensation. Trains have not run on this section of track for more than a decade, but the rail line wants to retain ownership in case it decides to reactivate the line, Fenno said.

Pinto said the toughest obstacle will be getting hikers and bikers over the Pompton River. Rohsler said the likely solution would be to add a pedestrian segment to an existing NYS&W bridge that now spans the waterway. That issue will be thoroughly explored in the design phase, he said.

The idea for the bike path was conceived more than a decade ago by Pete Standish, a Pequannock resident and avid cyclist, said local officials. When Standish died, he donated money to the township for the project. The money sits in a township account.

To memorialize Standish’s effort and contribution, a portion of the township’s bike lane may be dedicated in his name, officials have said.

"There is great interest in Pequannock to get this accomplished,’’ said Morris County Freeholder Jack Schrier. "We’re glad to see this finally moving along.’’

Once completed, the trail will be managed and policed by the Morris County Park Commission.

Staff writer Kristen Alloway contributed to this report.
Rozack is offline   Reply With Quote
Old 11-16-2009, 10:10 AM   #2
Dirt
Beginner
 
Join Date: Aug 2009
Location: morris county
Posts: 80
It's cool to see more trails approved, but wow, $2M for a 6 mile trail seems like a lot!
Dirt is offline   Reply With Quote
Old 11-16-2009, 10:14 AM   #3
gtluke
Pro
 
gtluke's Avatar
 
Join Date: Nov 2007
Location: west orange
Posts: 3,627
It's 4 million for 6 miles, just 2 of of is federal. Thankfully the feds have a surplus of cash to hand out to pave forests.
gtluke is offline   Reply With Quote
Old 11-16-2009, 12:06 PM   #4
graveyardman67
Team MTBNJ.com-Halter's
 
graveyardman67's Avatar
 
Join Date: Jul 2007
Location: Rockaway (not the beach)
Posts: 1,342
"The money will be used to design the project, including engineering, surveying, topographical, wetlands and other environmental reviews, said Frank Pinto, director of the Morris County Department of Planning and Development."

$4 Million for six miles. $126.26 per foot. Assuming it's 12 feet wide thats $10 per sq ft. Last time I checked asphalt was about $1 to $3 per square. Actually doesn't sound so bad. The only problem is, it will wind up costing $6 million, in which case this becomes ridiculous.
graveyardman67 is offline   Reply With Quote
Old 11-16-2009, 01:17 PM   #5
axcxnj
Expert
 
axcxnj's Avatar
 
Join Date: Jun 2008
Location: essex county
Posts: 649
leave it to the government to take care of things efficeintly
__________________
- Aaron
09 Gary Fisher Rig/ugly moose
09 Motobecane Fantom Cross Uno

SS stands for FUN - or for a cross bike, it stands for SuperSlow
axcxnj is offline   Reply With Quote
Old 11-16-2009, 01:39 PM   #6
UtahJoe
Semi-Pro
 
UtahJoe's Avatar
 
Join Date: May 2008
Location: Rockaway
Posts: 1,798
When I worked in civil I worked on the Byram bike path for a bit. I remember it being just like an actual road project. I had to do profile drawings, grading and cross sections every 50'. Which is great when you are building a road and there are drainage pipes, and underground utilities to be concerned with. But this was in the middle of the woods, I dont remember having to locate a single crossing utility of any kind. I thought that was a bit excessive for a bike path, but that was the requirements for building one. Adds plenty of cost to a project, thats for sure.

Last edited by UtahJoe; 11-16-2009 at 01:43 PM.
UtahJoe is offline   Reply With Quote
Old 11-16-2009, 02:52 PM   #7
Rozack
Sport
 
Rozack's Avatar
 
Join Date: Jul 2009
Location: Randolph, NJ
Posts: 303
I think the bridge over the river is adding a lot to to cost.
Rozack is offline   Reply With Quote
Old 11-16-2009, 03:01 PM   #8
gtluke
Pro
 
gtluke's Avatar
 
Join Date: Nov 2007
Location: west orange
Posts: 3,627
A friend of mine had a bridge put in for his cabin, it crosses the beaverkill river in NY, about the same size. It was only like 20k, and you drive a car across it. You can get pre engineered bridges for something like this. Not that the feds would ever do anything cost effective, I'm sure they will spend at least 5 times what a normal person would pay for anything. Well they normally do, I'm a subcontractor for government work, the government is so inundated with bureaucracy that they pay 5-10 times what anything should cost and the contractor still gets ripped off.
gtluke is offline   Reply With Quote
Old 11-16-2009, 08:14 PM   #9
montclairbobbyb
Sport
 
Join Date: Feb 2007
Location: Belle Mead, NJ
Posts: 451
Jdog can do a bridge for much less....
montclairbobbyb is offline   Reply With Quote
Old 11-16-2009, 08:36 PM   #10
Deezul
Sport
 
Deezul's Avatar
 
Join Date: Jun 2008
Location: New Brunswick
Posts: 201
This is on my wall
Attached Thumbnails
Click image for larger version

Name:	government-demotivator.jpg
Views:	42
Size:	93.3 KB
ID:	4368  
__________________
"Oh man, you totally ate it!"
Deezul is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT -5. The time now is 03:18 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Copyright © 2004-2010, All Rights Reserved, mtbNJ.com LLC